Dingtai manufactures complete Mitsubishi excavator undercarriage assemblies: rollers, idlers, sprockets, and track chains, engineered to reduce downtime in tough conditions.
We deliver factory-direct Mitsubishi undercarriage parts globally, offering OEM services, technical support, and direct savings with no middleman markups.
Our undercarriage components resist excessive wear and eliminate sudden breakage, drastically reducing unplanned downtime and maintenance costs on Mitsubishi equipment.
With over 20 years in manufacturing, Dingtai holds ISO9001 and SGS certifications, ensuring each component meets rigorous international quality standards.
Our undercarriage parts use 35MnB steel and deep quenching, delivering high surface hardness and a tough core for extreme durability.
Core Selling Points
- Global Brand Compatibility – Our undercarriage parts exactly match Mitsubishi excavator series (ME, MS, MM) and bulldozers, ensuring direct bolt-on fit without modifications.
- 20+ Years Experience – With over two decades specializing in undercarriage engineering, Dingtai has refined manufacturing processes to maximize part life and reliability.
- Premium 35MnB Material – We forge rollers and sprockets from 35MnB alloy steel, providing exceptional wear resistance and impact toughness for heavy excavating.
- 100% QC Inspection – Every component undergoes rigorous dimensional checks and hardness testing, guaranteeing zero-defect delivery to your job site with documented reports.
Our catalog of Mitsubishi Excavator Undercarriage Parts includes various specifications, fully compatible with Mitsubishi excavators and bulldozers.
Why Choose Dingtai?
Production Technical Parameters
| Parameter | Specification |
|---|---|
| Material | 35MnB alloy steel |
| Hardness (Roller Tread) | HRC 52–58 |
| Effective Case Depth | 4–8 mm |
| Process | Precision forging, deep quenching & tempering, CNC machining |
| Certification | ISO9001:2015, SGS |
| Warranty | 12 months or 2,000 working hours |
OEM & Customization
We customize undercarriage parts to your drawings, dimensions, or samples, maintaining strict OEM tolerance standards for perfect fit and function.
Applicable Models
| Machine Type | Compatible Brands | Popular Series/Models |
|---|---|---|
| Excavators | Mitsubishi | ME40, ME50, ME60, MS110, MS140, MM40, MM55, MM70, MM80 |
| Bulldozers | Mitsubishi | BD2F, BS3F, BD2G, BS3H |
Contact us for the full model list and technical cross-referencing.
Delivery & Logistics
We ship by reliable sea or air freight from China, providing factory-direct pricing and flexible MOQ starting from 1 piece.
Technical Features
Our rollers feature lifetime-lubricated floating seals that block dirt and water while retaining oil, ensuring maintenance-free operation in harsh environments.
Idler bushings use bimetal construction with a steel backing and high-density bronze layer, providing low friction and high load capacity.
Deep case hardening with effective depth of 4–8 mm provides a wear-resistant surface while preserving core toughness against shock loads.
Applications
- Mining
- Quarrying
- Heavy Construction
- Road Building
- Demolition
- Forestry
- Infrastructure Development
Frequently Asked Questions
What is the minimum order quantity (MOQ) for Mitsubishi undercarriage parts?
MOQ is 1 piece for standard items; larger orders secure better pricing.
What is the typical delivery time?
Standard parts ship within 15–25 days; custom orders may require 30–40 days. Expedited options available.
What is the heat treatment depth for your track rollers?
Effective case depth is 4–8 mm, achieving surface hardness HRC 52–58 while retaining a tough core.
Do you offer a warranty?
Yes, we provide a 12-month or 2,000-hour warranty against manufacturing defects under normal use conditions.
How do I match part numbers?
Provide your existing OEM part number or machine model, and we will cross-reference to supply the correct component.
Are your parts compatible with both old and new Mitsubishi models?
Yes, we cover a wide range of Mitsubishi excavator series including ME, MS, MM, and bulldozer models.
Can you supply non-standard or custom dimensions?
We accept custom orders based on your drawings or samples, ensuring exact specifications.
What certifications do you have?
We hold ISO9001:2015 and SGS certifications, with full material traceability and inspection reports.
Maintenance Guide
- Inspect track roller oil level quarterly; any oil leakage indicates seal failure requiring immediate replacement to prevent internal contamination.
- Monitor sprocket tooth wear; replace sprocket when tooth tip width reaches 20% of original to avoid chain damage.
- Check track chain tension frequently; over-tensioning accelerates wear, under-tensioning causes derailment.
- Grease idler tension adjuster every 500 hours using recommended lithium-based grease.
- Replace full undercarriage system after 4,000–6,000 working hours for optimal cost-efficiency.

